Importing Steel from China: Order Steps and Import Rules by Country

To import steel from China: send your list and port, check your country’s rules for each HS code, confirm the quotation, pay a 30% deposit, inspect before loading, and pay the balance against the bill of lading copy. The minimum order is one 20GP container, and products can be mixed.

Order steps

  1. Send your listDrawing, BOQ or list of sizes and quantities, and the destination port, by WhatsApp or email.
  2. Check your import rulesAsk your customs broker which HS code, certificate and licence each item needs (table below and the HS codes guide).
  3. Quotation and proforma invoiceWe quote per item in USD, FOB Tianjin Xingang, CFR or CIF. See a quotation sample.
  4. DepositT/T 30% deposit, or L/C at sight. Confirm our bank details by phone or WhatsApp before you pay.
  5. ProductionLead times start after the deposit; see the order terms below.
  6. Inspection and loadingThird-party inspection before loading if you want it. We pack and load in Tianjin: how we ship.
  7. Balance and documents70% balance against the B/L copy; we release the documents for customs clearance.

Order terms

Minimum orderOne 20GP container; products can be mixed, so a trial order can be one mixed container. Items longer than 5.8 m (sheets, pipes, sections) need a 40HQ (up to about 11.8 m); part loads can be consolidated
Lead timeFloor deck and bar truss deck: 10–20 days after deposit
Roof and wall sheets, colour-coated coil: Stock colours 7–15 days; special colours 15–25 days after deposit
C / Z purlins and cold-formed sections: 10–15 days after deposit
Steel supply (coil, sections, pipe, rebar, plate): Stock sizes 7 days to port; mill orders 15–30 days after deposit
PaymentT/T 30% deposit, 70% against B/L copy, or L/C at sight
Trade termsFOB Tianjin Xingang / CFR / CIF
InspectionThird-party inspection welcome, arranged by the buyer

Shipped from Tianjin Xingang. Orders over 5 containers are scheduled separately.

Before you pay, confirm our bank details by phone or WhatsApp on +86 186 2265 7958.

Import rules by country

A summary of our market pages; each page gives the official sources and the date we checked them. Rules change: your customs broker confirms them for your shipment.

CountryWhat applies to steel building productsWhat it means for your order
PhilippinesCoated and prepainted roofing sheets and coils are on the BPS list of products under mandatory certification (PS licence or ICC sticker).Ask your broker or BPS how PS / ICC applies to your shipment, and tell us which test reports you need.
IndonesiaMandatory SNI for zinc-coated, aluminium-zinc and prepainted steel (Permenperin 23/2025 and 24/2025), from 20 May 2026; a postponement was reported in February 2026.On 5 November 2026 we found no published regulation that puts the postponement into effect, so plan as if SNI applies; check the HS code of each item with your PPJK.
MalaysiaRegulated construction materials need a CIDB Certificate of Approval (COA); the Malaysian importer applies for it.Tell us before production which mill certificates, test reports and markings CIDB asks for.
United Arab EmiratesAn anti-dumping investigation on heavy hot-rolled H, I and U sections from China was reported in October 2025.We do not offer hot-rolled H, I or U beams for the UAE; cold-formed purlins and decking sheets are usually declared under other HS codes.
Saudi ArabiaBuilding materials come under SASO technical regulations; products and shipment certificates are registered on SABER.Expect the Quality Mark for GI and PPGI coil and sheet; check other items on SABER by HS code.
NigeriaEvery import needs an e-Form M opened by the importer; regulated products need SONCAP; the 2026 import prohibition list may cover some roofing sheets.Before you open Form M, ask your broker whether the HS code of each item is on the list.
PeruAnti-dumping duties apply to welded steel pipe and to wire rod from China (2026 resolutions).We do not offer welded pipe, tube or wire rod for Peru; we found no such measure on floor deck, calamina, C purlins or H-beams.

Documents

Related: HS codes · Container loading · Sheet quantity · All markets

Frequently asked questions

How do I import steel from China?

Send your drawing or list and destination port, check your country's import rules for each HS code, confirm the quotation and proforma invoice, pay the deposit, inspect before loading, and pay the balance against the bill of lading copy.

What is the minimum order?

One 20GP container. Products can be mixed, so a trial order can be one mixed container. Items longer than 5.8 m need a 40HQ (up to about 11.8 m).

What are the payment terms?

T/T 30% deposit and 70% against the B/L copy, or L/C at sight. Before you pay, confirm our bank details by phone or WhatsApp on +86 186 2265 7958; if an email says our bank details have changed, call us first.

Can I inspect the goods before shipping?

Yes. Third-party inspection is welcome; the buyer arranges it before loading in Tianjin.

Which documents do I get?

Commercial invoice and packing list (product, profile or section, thickness, coating, quantity and the HS code you confirm) and the bill of lading. Mill test certificate (EN 10204 3.1), issued by our group mill, available on request. Tell us before production which certificates your country asks for.

Do your products hold my country's certification?

Our pages do not state that our products hold PS, SNI, COA, SASO or SONCAP certificates. Your importer or broker confirms what applies; we supply the product documents and make goods available for testing and inspection where a scheme requires it.

Sources

  1. DTI Bureau of Philippine Standards, List of products under mandatory certification: Steel coils and sheets – coverage and the PNS standards listed for hot-dip metallic-coated and pre-painted galvanized steel coils and sheets
  2. Permenperin No. 23 Tahun 2025 (amends Permenperin 67/2024), text on pasal.id – SNI 2053:2024 (Bj LS) and SNI 66:2024 (Bj LSW); applies to imports; effective 20 May 2026; transition for goods cleared by customs before that date
  3. CIDB Holdings, Certificate of Approval (COA) – Act 520 sections 33C, 33D and 33E; fine of RM10,000 to RM500,000; link to the Customs (Prohibition of Imports) Order 1998 (Amendment 2012)
  4. SteelOrbis, 17 October 2025: UAE initiates AD investigation on heavy steel sections from China – UAE Ministry of Foreign Trade; complaint by the sole domestic producer; U, I and H sections and alloy steel angles, HS 721631, 721632, 721633, 722870
  5. SABER platform – registers products and certificates of conformity and issues shipment certificates; under the supervision of SASO
  6. Cotecna, 12 May 2020: Everything you need to know about the e-Form M – e-Form M through an authorised dealer bank or the Nigeria Single Window; valid 180 days, extendable by 180 days; SON-regulated goods need a PC
  7. Standards Organisation of Nigeria, SONCAP services – PC 1 valid for one shipment, PC 2 and PC 3 for one year; PC needed to open Form M; SC is a mandatory customs clearance document; exemptions
  8. El Peruano, Resolución N.° 156-2026/CDB-INDECOPI (13 July 2026) – definitive anti-dumping duties for 5 years on welded hot-rolled carbon steel pipes and tubes (round 1/4" to 4", square 25–400 mm, rectangular 20–400 mm) from China; HS 7306.30.10.00, 7306.30.99.00, 7306.61.00.00, 7306.69.00.00, 7306.90.00.00; dumping margins 8.3% to 32.1%; duties US$49.2 to US$193.6 per tonne
  9. WCO, What is the Harmonized System (HS)? – six-digit codes; used by more than 200 countries and economies as the basis of their tariffs

Summary written on 16 November 2026 from our market pages; their sources were checked on 5 November 2026.

Get a Quote for Other / several products

Send your drawing or size list; we reply with a price.

Working hours: Mon–Sat 8:30–17:30 Beijing time (UTC+8).

Email us

Or email sales01@kexinda-industry.com

What a quotation from us includes: see a blank quotation sample.

Fill in what you know; the form opens WhatsApp or your email with the message ready to send.

You can attach your drawing or BOQ in WhatsApp or email after the message opens.

WhatsAppGet a Quote